What we've proven
Delivered programmes. Real clients. Real outcomes. Real evidence.
EGG has delivered every stage of its circular model in practice — from targeted rescue through to enterprise-scale programme management.
Filtered by sector
Public sector & estates(5 case studies)

Reactive remanufacture · Public sector
Aberdeenshire Council
First-generation LED fittings failing in two care homes, rebuilt to as-new rather than replaced — halving the embodied carbon of every fitting, with the difference spent on sensors and corridor dimming.
Read the project →
Remanufacture · January–March 2022
Edinburgh Leisure
40 fittings removed from one Edinburgh Leisure venue, rebuilt to as-new in Glasgow and installed in another, at 40% below the cost of equivalent new.
Read the project →
Glasgow Life · Lighting remanufacture
Kelvingrove Bandstand
112 spotlights remanufactured at Glasgow's Kelvingrove Bandstand, preserving the historic venue's aesthetics while keeping 68.24 kg of material in use and saving over 596.8 kg of embodied carbon.
Read the project →
Public sector · A decade of work
Scottish Prison Service
2,187 fittings replaced across three establishments in four months — and the reason we no longer start from replacement.
Read the project →
Electrical delivery · Public sector
Scotstoun Stadium
96 floodlight heads replaced across four 25m masts at Scotstoun Stadium for Glasgow Life, working inside a live track replacement, ahead of the 2026 Commonwealth Games.
Read the project →
Conversation, not tender
Start with a conversation.
No tender process required. No sales pressure. A straight answer about what your estate is worth.
