Skip to main content

The front door to every EGG engagement

Know what your lighting estate is worth — before you replace it.

One site visit. Three deliverables. A replace-versus-remanufacture comparison in your own fittings and your own numbers — before a single fitting comes off the wall.

The problem this solves

Between deciding to upgrade a lighting estate and the first fitting coming off the wall, there's a decision: replace, or remanufacture and return?

Today most estate owners reach that moment with no information to base it on — so they default to replacement. The audit changes the economics of that decision by putting the evidence on the table first.

One visit, three outputs

Everything you need to decide — in three documents.

01

Technical scope

What's installed, its condition, and the replace-or-remanufacture options for each fitting family.

02

Triage assessment

Which fittings pass the remanufacture-viability gate, and what they'd be worth to you remanufactured and returned, below new-procurement cost.

03

Projected waste & carbon report

The WEEE profile and Scope 3 Category 5 carbon position for everything that doesn't pass, modelled two ways: remanufacture-and-return versus straight replacement.

The two-scenario comparison

Your estate. Your fittings. Your numbers — side by side.

Scenario A

Remanufacture & return

Scenario B

Replace with new

Capital cost
Below new-procurement cost
Full new-build pricing
Embodied carbon (Scope 3 Cat. 5)
~70–85% avoided per fitting
Full embodied carbon counted
WEEE profile
Diverted from waste stream
Old fittings to WEEE disposal
Compliance & warranty
5-year warranty · DPP issued · BS 8887-221:2024
Manufacturer warranty · varies
Programme disruption
Phased, fitting-by-fitting
Full rip-and-replace

Anonymised, illustrative sample. Every audit produces this comparison against your own estate.

You're looking at your own estate, your own fittings, your own numbers. The remanufacture case either stacks up or it doesn't — and we have the confidence to show it either way. That's the difference between a decision adviser and a contractor recommending its own product.

The honest-broker promise

We recommend replacement when replacement is genuinely better.

Remanufacture isn't always the right answer. When the economics, safety or design don't support it, the audit says so. That objectivity is the value of the system — and the reason estate owners trust what comes next.

How it starts

The demonstration audit.

We introduce most clients through a demonstration audit: we audit one site in your pipeline at our own cost and produce all three outputs, so the value is proven in your estate rather than asserted in a brochure.

Once it's proven, the engagement converts to a paid Portfolio Lighting Decision Audit — sized to be self-funding through the savings and avoided procurement it identifies.

Step 1 · Demonstration audit (at our cost)Step 2 · Portfolio audit (self-funding)

What the audit feeds

The first structured data record of your lighting estate.

From it, two services run in parallel — remanufacture-and-return and waste documentation (a compliance deliverable in its own right) — and every record can be carried forward into LightLoop for ongoing compliance and lifecycle tracking.

Remanufacture & return

Rebuild to BS 8887-221:2024.

Waste documentation

Audit-grade compliance record.

LightLoop

Lifecycle data, kept current.

Conversation, not tender

Start with a conversation.

No tender process required. No sales pressure. A straight answer about what your estate is worth.