Remanufacture · Sheltered housing

Trust Housing Association, Mission Place

Communal lighting renewal in an occupied sheltered housing scheme, with every fitting position surveyed and recorded before anything was specified.

Remanufactured Mission Place wall light illuminated in a communal corridor
Mission Place, Motherwell — a communal corridor after installation.

62%

of each fitting reused, by weight

19.9 kgCO₂e

embodied carbon retained per fitting. Self-assessed to CIBSE TM65:2020

The appraisal

Every position assessed before anything was specified

Mission Place is a Trust Housing Association sheltered housing development in Motherwell. We surveyed the communal areas position by position — two floors, seven hallways, stairwells and two common rooms — and recorded every fitting individually before specifying anything.

The appraisal reached a different answer in almost every room. Where the existing fitting was an ASD Harmony and was worth keeping, we remanufactured it: the original aluminium housing and polycarbonate diffuser retained, everything inside replaced, built to a 26-point specification with a verification method against every requirement.

Where it was not worth keeping, we specified bought-in replacements by name — and in two positions specified new product in preference to a remanufactured one.

Occupied building

Installed and certified circuit by circuit

Installation ran circuit by circuit in an occupied building, with residents at home throughout and no decant. We issued 47 Minor Works Certificates and a BS 5266-1 emergency lighting completion certificate with the full compliance checklist completed, not simply signed.

A year later the same remanufactured product was specified again for a second Trust Housing scheme.

Mission Place fittings opened for inspection on the EGG Lighting workshop bench
Sample inspection in the EGG workshop before the remanufacturing specification was finalised.
Original Mission Place gear tray removed during disassembly
The original gear tray recorded during disassembly.
Original fluorescent and emergency-lighting components inside a Mission Place fitting
The original internal components before replacement.
Completed replacement gear tray after workshop review
The rebuilt gear tray after review, ready to return to the retained housing and diffuser.

Embodied carbon

What the carbon figure does and does not mean

19.9 kgCO₂e is embodied carbon retained — the carbon in the housing and the diffuser we did not have to make again. It is not an operational energy saving.

A remanufactured fitting and an equivalent new one draw the same load, so the energy saving at Mission Place came from replacing what was there before, which is a different comparison against a different baseline. If you have a carbon figure to publish, you need to know which of the two you are quoting. We will tell you which.

The evidence behind the figures

Where these numbers come from

FigureWhat it rests onStatus
62% of each fitting reused by weightBill of materials within the TM65 calculation; component weights measuredMeasured
19.9 kgCO₂e retained per fittingEmbodied carbon calculation to CIBSE TM65:2020, mid-level method, 1.3 buffer factorSelf-assessed, May 2023
26-point specification with a verification method against every requirementApproved remanufacturing specification, 18 May 2023Specified
47 Minor Works CertificatesProject handover file — 40 internal, seven externalCertificates issued
BS 5266-1 completion certificate with the checklist completedEmergency Lighting Completion Certificate 107-ML1-11112024RH, 11 November 2024Certificate issued to the client
Specified again for a second Trust Housing schemeProcurement schedule, 27 September 2024Purchasing record
Survey of every positionLighting survey record, 13 September 2023Primary record

Open evidence pack

Every figure here sits on a dated project record

The full case study sets out the specification, the conformity assessment, the certification and the carbon calculation, and names the source document behind every figure.

Download the Mission Place case study (PDF) ↓
Finished EGG remanufactured ASD Harmony bulkhead with product label and unit identifier
The finished product — UKCA marked and carrying its own unit identifier.